Showing posts with label demolition. Show all posts
Showing posts with label demolition. Show all posts

Tuesday, March 19, 2013

EPA Brownfields 2013 Latest Information News and Program Updates

March 19 2013 - there are some new press releases and information posted on the USEPA Brownfields Program site.  A summary follows:

Fiscal Year 2013

  • Evaluation of the National Brownfields Program
    • EPA recently conducted the first national program evaluation of the outcomes, efficiencies, and economic benefits produced by Brownfields grants. Over 8,000 Brownfield sites were evaluated to determine property milestones achieved and how funding was used at those properties. As a result of this evaluation, EPA's Brownfields Program has been able to make important programmatic changes to their grant and Revolving Loan Fund activities to improve future outcomes.
      Evaluation of the Brownfields Program, Part I and Part II
    • The final section of the evaluation was a rigorous analysis, using fixed-effect and quasi-experimental methods, estimating the causal effect of Brownfields cleanups on personal property values. Through this analysis it was determined that personal property values increased 5.1% - 12.8% near Brownfield sites when cleanup is completed. Part III of this evaluation can be found here:
      Estimating the Impacts of Brownfield Remediation on Housing Property Values
  • FY 2013 Environmental Workforce Development and Job Training Grant Application Guidelines - Request for Proposals
    EPA provides funds to nonprofit organizations and eligible entities to deliver environmental workforce development and job training programs focused on hazardous and solid waste management, assessment, and cleanup associated activities, chemical safety, and wastewater management. Environmental Workforce Development and Job Training (EWDJT) grants are provided to recruit, train, and place, unemployed and under-employed, including low-income and minority, residents historically affected by hazardous and solid waste sites and facilities with the skills needed to secure full-time, sustainable employment in the environmental field and in the assessment and cleanup work taking place in their communities. Proposals are due April 9,2013.
  • Technical Assistance to Brownfields Communities - New TAB Grants Announced
    The EPA recently selected a new round of TAB grantees. Building on their previous experience working with communities, and their extensive team of subgrantees, contractors, partners and other network contacts, three new TAB grantees, the New Jersey Institute of Technology (NJIT), Kansas State University (KSU), and the Center for Creative Land Recycling (CCLR), will help communities tackle the challenge of assessing, cleaning up and preparing brownfields sites for redevelopment, especially underserved, rural, small, and otherwise distressed communities. Technical assistance being provided through these grants will help communities across the country move brownfields sites forward in the process toward cleanup and reuse. More information about the TAB grantee providing technical assistance in your area can be found at the following link - http://www.epa.gov/brownfields/tools/index.htm

  • FY2013 Brownfields Area-Wide Planning Grant Guidelines – Request for Proposals
    These grants may be used by communities to facilitate community involvement in developing an area-wide plan for brownfields assessment, cleanup and subsequent reuse on a catalyst site and other high-priority brownfield sites. Each grant is funded up to $200,000 for two years. The proposal submission deadline is November 30, 2012.
Please contact Three D Enterprises, LLC should you need any assistance in devloping a cost estimate to demolish a building or facility as part of a Brownfields Redevelopment Program

Damon Kozul, PE, CHMM  dkozul@scrapmetalprices.biz

Thursday, January 31, 2013

OSHA Construction Safety Training Video Scaffolding

January 31 2013 -

This video was intended as an OSHA compliance officer training video and covers the basics of scaffold safety and OSHA requirements found in 29 CFR 1926 Subpart M. This video is ideal for construction safety training sessions and toolbox talks.

On many demolition and asbestos project, scaffolding is needed.  This video is a good start to learn the safety basics.  Please make sure you check current regulations and laws for updated information.


Tuesday, January 29, 2013

Demolition Preparatory Operations as Per OSHA

January 29 2013
OSHA states on their website that prior to permitting employees to start demolition operations, an engineering survey shall be made, by a competent person, of the structure to determine the condition of the framing, floors, and walls, and possibility of unplanned collapse of any portion of the structure. Any adjacent structure where employees may be exposed shall also be similarly checked. The employer shall have in writing evidence that such a survey has been performed.

When employees are required to work within a structure to be demolished which has been damaged by fire, flood, explosion, or other cause, the walls or floor shall be shored or braced.

All electric, gas, water, steam, sewer, and other service lines shall be shut off, capped, or otherwise controlled, outside the building line before demolition work is started. In each case, any utility company which is involved shall be notified in advance.

If it is necessary to maintain any power, water or other utilities during demolition, such lines shall be temporarily relocated, as necessary, and protected.

It shall also be determined if any type of hazardous chemicals, gases, explosives, flammable materials, or similarly dangerous substances have been used in any pipes, tanks, or other equipment on the property. When the presence of any such substances is apparent or suspected, testing and purging shall be performed and the hazard eliminated before demolition is started.

Where a hazard exists from fragmentation of glass, such hazards shall be removed.

Where a hazard exists to employees falling through wall openings, the opening shall be protected to a height of approximately 42 inches.

When debris is dropped through holes in the floor without the use of chutes, the area onto which the material is dropped shall be completely enclosed with barricades not less than 42 inches high and not less than 6 feet back from the projected edge of the opening above. Signs, warning of the hazard of falling materials, shall be posted at each level. Removal shall not be permitted in this lower area until debris handling ceases above.

All floor openings, not used as material drops, shall be covered over with material substantial enough to support the weight of any load which may be imposed. Such material shall be properly secured to prevent its accidental movement.

Except for the cutting of holes in floors for chutes, holes through which to drop materials, preparation of storage space, and similar necessary preparatory work, the demolition of exterior walls and floor construction shall begin at the top of the structure and proceed downward. Each story of exterior wall and floor construction shall be removed and dropped into the storage space before commencing the removal of exterior walls and floors in the story next below.

Employee entrances to multistory structures being demolished shall be completely protected by sidewalk sheds or canopies, or both, providing protection from the face of the building for a minimum of 8 feet. All such canopies shall be at least 2 feet wider than the building entrances or openings (1 foot wider on each side thereof), and shall be capable of sustaining a load of 150 pounds per square foot.

For additional information on OSHA demolition regulations go to OSHA's website or contact Damon Kozul, PE, CHMM at dkozul@scrapmetalprices.biz